CURRICULUM VITAEMOHAMED ASIF HANEEFMobile: 0097455670922PERSONAL PROFILE Result-oriented professional with over 26 years of experience in installation & commissioning and project management of Power plant, Sub-Station and Industrial power projects. Proficient in swiftly completing projects with competent cross-functional skills and ensuring on time deliverables within pre-set cost parameters. Track record in identifying & resolving problems, ramping-up project activities with on-time deliverables and maximizing efficiency with risk management Expert in maintaining a smooth flow of work between departments and resolving inter-departmental conflicts.

ACADEMIC OVERVIEWFeb 1991: Engineering Degree in Electrical & Electronics, Mysore University- India

COMPUTER PROFICIENCYAuto Cad, MS OFFICE (Access, Excel, and Word), & MS project

AWARDS & LAURELSReceived appreciation from: The client SEC-COA for completing 500MW project just in six months from the day of award to last GT synchronization The management as outstanding employee for completing the 500MW project in just six months.

ACHIEVEMENTS: Singly handedly led the electrical commissioning of 480 MW plant in short span of 6 months which was declared as super-fast project (Project duration was 8 months from the day of issuing letter of intent to last GT synchronization). 132kV substation was commissioned in just 20 days in order to bring 600 MW on grid to meet the summer demand in Saudi Arabia as project acceleration. 12 GTs were synchronised in just 10 days with commissioning of 380kV protection for transformers, cable and generators to meet the summer demand in Saudi Arabia. Responsible head for commissioning of all electrical systems related to 40 GTs including LV and HV systems in just span of two years. Handled two projects(1200MW+1600MW) simultaneously as an electrical commissioning head.

CORE COMPETENCE AND KEY PROJECTSProject Management: Competent Project/commissioning Manager with excellent communication, organization and coordination skills. Possessing a proven track record of preparing and executing project/startup plans and programs, ensuring that work is carried out in accordance with the companys procedures and clients satisfaction.

Testing and commissioning Extensive experience in hands-on testing of all numerical relays like differential, distance, bus bar protection and all other basic relays. Hands-on experience in logical & interlock checks for GIS, bus bar, generator transformers feeder, SGT feeder, double bus scheme. Performed Generator, UAT, GSU, overall and bus bar stabilities, scheme checks, End to end tests etc. Hands-on testing of system/equipment for 380V, 400V, 4.16kV, 6.6kV, 13.8kV, 33kV, 132kV, 380kV, 400kV System (both 50 and 60Hz), right from switchgears, transformers, GIS, GIB, high voltage cable, large rotating machines. Produce all kind of field testing programs for protection scheme of power transformer, generators, neutral ground transformer, capacitor banks, line feeders, bus bar protection with all kind of static and IED relays ,

Engineering Design: Review of system studies which consist of power/load flow analysis, short circuit calculation, motor starting, and relay coordination studies, Operation philosophies, area classification drawings, GA drawings etc. Review of protection schemes , interlock , inter-trip/trip matrix and schemes, Design of protection, control and synchronization schemes for generator, Generator transformer, bus bar and high voltage cable feeder, bus bar protection up to 380kV system Design of CT shorting and isolating along with cross trip isolation system for generators feeders, preparation of specification, data sheets etc.

OPERATION AND MAINTENANCE: Worked for 4+2 years in operation and maintenance of power plant and chiller plant with responsibility for preparing preventive maintenance task, schedule and execution. Switching operation of 380/132kV GIS

OTHER TECHNICAL SKILLS: Fair knowledge in AC/DC drives, DCS, SCADA, Fire alarm systems, Instrumentation and low current system like public address, telephone master clock system .

MAJOR PROJECTS HANDLED EPIC for Power Supply Project through Submarine Cable from Ras Laffan to Halul Island. (Onshore and Offshore projects) 100MW Power supply, working as the Project Commissioning Manager EPC-Riyadh Power Plant #12-Combned Cycle. 2175 MW Power Generation, worked as Electrical Commissioning Manager EPC-Riyadh Power Plant #10-Combined Cycle Conversion. 1300MW power Generation, worked as Electrical Commissioning Manager 132/13.8kV substation# 8135 (Riyadh) by ABB. Worked as a Commissioning Manager EPC-Riyadh Power Plant #10- C1 Block Simple Cycle Extension. 500MW power generation, worked as Electrical Commissioning Manager EPC-Riyadh Power Plant #10-Simple Cycle. 2000 MW power generation, worked as Electrical Commissioning Manager EPC-Riyadh Power Plant #9-Block F Extension. 720MW power generation, worked as Electrical Commissioning Manager EPC-Riyadh Power Plant #9-Block C&D Extension and 132kV Substation, worked as Electrical Commissioning Manager EPC-AL Aweer-Phase-2 Gas turbine Project 450MW power generation, worked as Electrical Commissioning Lead EPC-Riyadh Power plant-7-Phase-3A project. 172MW power generation, worked as Electrical Commissioning Lead EPC-Hail and Juba power plant- Air inlet cooling. Worked as Electrical Commissioning Lead and Designer. EPC-Riyadh Power plant-9-E block Extension.500 MW power generation, worked as a Senior Commissioning Engineer EPC-Riyadh Power plant-9-combined cycle.1200 MW power generation, worked as Testing and Commissioning Engineer

EMPLOYMENT PROFILEFrom May 2015 presentLS Cable and SystemsProject: EPIC for Power Supply Project through Submarine Cable from Ras Laffan to Halul Island in Qatar. EPIC contract awarded by Qatar Petroleum.Description: Project comprises manufacture and laying of 2 No. 132kV 3 core submarine cables (each 100km) and the construction of a 132/34.5kV substation in island.Designation: Commissioning Manager.Roles and Responsibility:Managing and coordinating all aspects pertaining to the testing and commissioning Electrical, Mechanical and Instrumentation of the 132kV submarine power cable and Substation.Reviewing engineering submittals, operation philosophy, system studies, design calculation, specification, data sheets, SLDs and CPM, schematics etc.Reviewing test and commissioning procedures, ITPs, FAT procedure and method statements.Preparing commissioning/Start-up plan including handover procedure based on contractual termsConducting Commissioning meeting with subcontractor and clientPreparing test procedures, switching program, post energization operation and maintenance plan.

From Nov97 to April 2015: Arabian Bemco Ltd & Bemco Services (Formerly Saudi Binladin Group)Key projects handled under Arabian Bemco which is EPC leader in power sector (KSA) and has constructed plants and substations more the 20,000 MWsProject:Riyadh Power Plant #12-Combned Cycle. A project owned by Saudi Electricity Contracted to GS and BEMCO Joint Venture; 2175MWDescription:Project consists 8 Gas Turbines (GE-Frame F) each one is about 190MW and 2 steam turbine (Alstom) 360 MW each with 8 HSRGs and BOP, gas compressors and motors of 11.6MW ,water bath heaters and 380kV substation (breaker and a half scheme).Duration:May 2014 to April 2015Designation:Electrical Commissioning Manager.Roles and Responsibility:During Design and pre approval stageDesign and review of protection schemes of Generator, GSU and UAT transformer and other electrical equipmentDesign of interlocks, inter trips, cross tripping and trip isolation schemesDesign and review of CT/VT calculation, Relay studies and fault and Load calculationReview of cable sizing, transformers and motor sizing.During testing and commissioning PhasePreparation of commissioning/start up program which consists of Execution plan. Schedule, start up sequences, Manpower/testing equipments and special tools histogram, organization chart.Preparation of inter trip, interlock, stability, synchronization and back feed protocols along with switching programs.Supervising and managing all testing and commissioning activities within the scope:Training and helping subordinates in testing and commissioningParticipating in first time energization of substation, Generator transformer feeders from the grid in coordination with ECC.

Project:Riyadh Power Plant #10-Combined Cycle Conversion. A project Owned by Saudi Electricity; 3000MWDescription:Project consists 10 Steam Turbines (GE) each one is about 128MW and 40 steam Generators(HSRG) with a capacity of each around 125 t/hr. all the power generators are connected to 380kV substation through step-up transformersDuration:October 2013 to April 2015 (Simultaneously working on PP12 following day to day activities closely with lead engineers)Designation:Electrical Commissioning ManagerRoles and Responsibility:During Design and pre-Approval stageDesign and review of protection schemes of Generator, GSU and UAT transformer and other electrical equipmentsDesign and review of single line, three lines, CPM, cable block diagramsReview of Short circuit studies, relay coordinationDesign of interlocks; inter trips, cross tripping and trip isolation schemes, Design and review of transformer, cable and motor sizing and design and review of CT/VT calculation.During testing and commissioning phasePreparation of project schedule (T&C), scope of work, testing and commissioning procedure. Preparation of inter trip, interlock, stability, synchronization and back feed protocols.Supervising and managing all testing and commissioning activities:Training and helping subordinates in testing and commissioning.Organizing and conducting meetings with client and vendor related to commissioningCo-ordination with different department for daily commissioning activitiesManaging FAT inspection for MV/LV switchgear, transformers and 380kV protection panels at vendors factory.Design and upgrading system and protections schemesParticipating in first time energization of generator transformer feeders from the grid in coordination with ECC.

Project:Riyadh Power Plant #10- C1 Block Simple Cycle Extension. Project owned by Saudi Electricity.500MWDescription:Project consists of 8 Gas Turbines (GE-Frame E) each one is about 60MW. Each set of 2 generators are connected to 380kV substation via three winding (220MVA) transformer.DurationJanuary 2012 to October 2013Designation:Electrical Commissioning Manager.Roles and Responsibility:During Design and preapproval stageDesign and review of protection schemes of Generator, GSU and UAT transformer and other electrical equipmentDesign and review of single line, three lines, CPM, cable block diagramsReview of Short circuit studies, relay coordinationDesign of interlocks, inter trips, cross tripping and trip isolation schemesDesign and review of transformer, cable motor sizing, design and review of CT/VT calculation.During testing and commissioning phasePreparation of startup plan, project schedule (T&C), Scope of work, testing and commissioning proceduresPreparation of inter trip, interlock, stability, synchronization and back feed protocols.Supervising and managing all testing and commissioning activitiesTraining and helping subordinates in testing and commissioning.Organizing and conducting meetings with client and vendor for above worksCommissioning of AGC through SCADACo-ordination with different department for daily commissioning activitiesAttending FAT inspection for MV/LV switchgear, transformers and 380kV protection panels in factory.Participating in first time energization of generator transformer feeders from the grid in coordination with ECC.

Project: Riyadh Power Plant #10-Simple Cycle. Project Owned by Saudi Electricity 2000MWDescription:Project consists 32 Gas Turbines (GE-Frame E ) each one is about 60MW. Each set of Two Generators of GTs are connected to 380kV substation via three winding (220MVA) Transformer and 380V GIB.Project Capacity2000MW (Power Generation)DurationNov 2009 to Dec 2011Designation:Electrical Commissioning Manager.Roles and Responsibility:During Design and preapproval stageDesign and review of protection schemes of Generator, GSU and UAT transformer and other electrical equipment. Design and review of single line, three line, CPM, cable block diagramsReview of Short circuit studies, relay coordinationDesign of interlocks , inter trips , cross tripping and trip isolation schemesDesign and review of transformer, cable motor sizingDesign and review of CT/VT calculation.During testing and commissioning PhasePreparation of startup plan, project schedule (T&C), Scope of work, testing and commissioning procedurePreparation of inter trip, interlock, stability, synchronization and back feed protocols.Supervising and managing all testing and commissioning Activities:Training and Helping subordinates in testing and commissioning.Organizing and conducting meetings with client and vendor for above worksCommissioning of AGC through SCADACo-ordination with different departmentManaging FAT inspection for MV/LV switchgear, transformers and 380kV Protection panels at vendors factory.Development of Black starts recovery procedures and implementation.Participating in first time energization of generator transformer feeders from the grid in coordination with ECC.

Project: Riyadh Power Plant #9-Block F Extension. A Project Owned by Saudi Electricity. 720MWDescription:Project is consisting of 12 Gas Turbines (GE-Frame E) each one is about 60MW. Each set of Two Generators of GTs are connected to 380kV substation via three winding (220MVA) Transformer and 380kV XLPE cableNote: Due to time limitation, with proper planning 12 GTs were synchronised in just 10 days with commissioning of transformers and cable protection.DurationJan, 2008 to Oct, 2009DesignationElectrical Commissioning ManagerRoles and Responsibility:Design review for control, protection and interlock schemes and power system for 480V, 4.16kV, 13.8kV and 380kV systemsPreparation of startup plan, project schedule (T&C), Scope of work, testing and commissioning procedurePreparation of inter trip, interlock, stability, synchronization and back feed protocols.Supervising and managing testing and commissioning engineers and personally involved in testing and commissioning.Training and Helping subordinates in testing and commissioning.Organizing and conducting meetings with client and vendor for above worksCommissioning of DCS and AGC/SCADAParticipating in first time energization of generator transformer feeders from the grid in coordination with ECC.

Project:Riyadh Power Plant #9-Block C&D Extension. A project Owned by Saudi Electricity 1200MWDescription:Project is consisting of 20 Gas Turbine (GE-Frame E) each one is about 60MW. Each set of Two Generators of GTs are connected to 132kV substation via three winding (220M...