  • Lembar 1

    BACK UP DATA PENGUKURAN TIMBUNAN

    KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATURPEKERJAAN :

    :LOKASI : KABUPATEN BENGKALISTAHUN ANGGARAN: 2015

    NoPanjang Lebar Tinggi Luas Volume

    M M M M2 M31 1.000 ### 0.700 1.000 0.700 2 1.000 5.700 0.950 5.700 5.415 3 2.100 3.300 0.950 6.930 6.584 4 1.000 5.700 0.950 5.700 5.415 5 1.000 2.100 0.950 2.100 1.995 6 3.300 1.000 0.900 3.300 2.970 7 3.300 5.700 0.980 18.810 18.434 8 3.300 ### 0.850 10.890 9.257 9 3.300 5.700 1.200 18.810 22.572

    10 3.300 2.150 1.050 7.095 7.450 11 3.350 0.960 0.900 3.216 2.894 12 3.350 5.700 1.050 19.095 20.050 13 3.350 3.300 0.950 11.055 10.502 14 3.350 5.700 1.100 19.095 21.005 15 3.350 2.150 1.000 7.203 7.203 16 3.420 0.950 0.900 3.249 2.924 17 3.420 5.700 1.050 19.494 20.469 18 3.420 3.300 0.980 11.286 11.060 19 3.420 5.700 0.850 19.494 16.570 20 3.420 2.150 0.850 7.353 6.250 21 3.350 0.950 0.900 3.183 2.864 22 3.350 5.700 0.920 19.095 17.567 23 3.350 3.300 0.950 11.055 10.502 24 3.350 5.700 0.920 19.095 17.567 25 3.350 2.150 0.980 7.203 7.058 26 3.320 1.000 0.900 3.320 2.988 27 3.320 5.700 0.850 18.924 16.085 28 3.320 3.300 0.820 10.956 8.984

    SUB TOTAL 293.705 283.334

    Diperiksa Oleh : Dibuat Oleh :KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

    CV. MULTY DESEKO PT. TIGA PUTRA WIJAYA

    LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

    Kuantitas ( N )

  • Lembar 2

    ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan

  • Lembar 3

    BACK UP DATA PENGUKURAN TIMBUNAN

    KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATURPEKERJAAN :

    :LOKASI : KECAMATAN BENGKALISTAHUN ANGGARAN: 2015

    NoPanjang Lebar Tinggi Luas Volume

    M M M M2 M329 3.320 5.700 0.800 18.924 15.139 30 3.320 2.150 0.780 7.138 5.568 31 2.130 0.900 0.550 1.917 1.054 32 2.130 5.700 0.580 12.141 7.042 33 2.130 3.300 0.800 7.029 5.623 34 2.130 5.700 0.850 12.141 10.320 35 2.130 3.360 0.670 7.157 4.795 36 3.350 0.900 0.450 3.015 1.357 37 3.350 5.700 0.450 19.095 8.593 38 3.350 3.300 0.450 11.055 4.975 39 3.350 5.700 0.650 19.095 12.412 40 3.350 0.900 0.520 3.015 1.568 41 3.350 2.250 0.600 7.538 4.523 42 3.400 3.300 0.550 11.220 6.171 43 3.400 2.100 0.480 7.140 3.427 44 3.400 3.300 0.480 11.220 5.386 45 3.400 0.900 0.500 3.060 1.530 46 3.400 2.250 0.500 7.650 3.825 47 3.400 3.300 0.520 11.220 5.834 48 3.400 2.250 0.550 7.650 4.208 49 3.400 3.300 0.550 11.220 6.171 50 3.400 0.900 0.500 3.060 1.530 51 3.400 2.250 0.500 7.650 3.825 52 3.400 0.930 0.600 3.162 1.897 53 3.400 5.700 0.550 19.380 10.659 54 3.400 3.300 0.650 11.220 7.293 55 3.400 5.700 0.500 19.380 9.690 56 - -

    SUB TOTAL 263.491 154.413

    Diperiksa Oleh : Dibuat Oleh :KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

    CV. MULTY DESEKO PT. TIGA PUTRA WIJAYA

    LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

    Kuantitas ( N )

  • Lembar 4

    ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan

  • Lembar 5

    BACK UP DATA PENGUKURAN TIMBUNAN

    KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATURPEKERJAAN :

    :LOKASI : KECAMATAN BENGKALISTAHUN ANGGARAN: 2015

    NoPanjang Lebar Tinggi Luas Volume

    M M M M2 M357 3.400 0.900 0.560 3.060 1.714 58 3.400 2.250 0.550 7.650 4.208 59 2.150 0.900 0.580 1.935 1.122 60 2.150 5.700 0.450 12.255 5.515 61 2.150 3.300 0.450 7.095 3.193 62 2.150 5.700 0.540 12.255 6.618 63 2.150 0.900 0.450 1.935 0.871 64 2.150 2.250 0.450 4.838 2.177 65 3.350 0.950 0.600 3.183 1.910 66 3.350 5.700 0.500 19.095 9.548 67 3.350 3.300 0.500 11.055 5.528 68 3.350 5.700 0.600 19.095 11.457 69 3.350 2.150 0.450 7.203 3.241 70 3.350 0.900 0.750 3.015 2.261 71 3.350 5.700 0.550 19.095 10.502 72 3.350 3.300 0.570 11.055 6.301 73 3.350 5.700 0.600 19.095 11.457 74 3.350 2.150 0.530 7.203 3.817 75 3.400 0.900 0.580 3.060 1.775 76 3.400 5.700 0.550 19.380 10.659 77 3.400 3.300 0.480 11.220 5.386 78 3.400 5.700 0.550 19.380 10.659 79 3.400 2.150 0.450 7.310 3.290 80 3.400 0.950 0.500 3.230 1.615 81 3.400 5.700 0.600 19.380 11.628 82 3.400 3.300 0.600 11.220 6.732 83 3.400 5.700 0.550 19.380 10.659 84 3.400 2.150 0.400 7.310 2.924

    SUB TOTAL 290.985 156.764

    Diperiksa Oleh : Dibuat Oleh :KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

    CV. MULTY DESEKO PT. TIGA PUTRA WIJAYA

    LANJUTAN PEMBANGUNAN GEDUNG SEKOLAH TINGGI ILMU EKONOMI (STIE) SYARIAH KAB. BENGKALIS

    Kuantitas ( N )

  • Lembar 6

    ADE DESRY KURNIAWAN, A.Md MUSMULYADIInspector Pelaksana Lapangan

  • Lembar 7

    BACK UP DATA PENGUKURAN TIMBUNAN

    KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATURPEKERJAAN :

    :LOKASI : KECAMATAN BENGKALISTAHUN ANGGARAN: 2015

    NoPanjang Lebar Tinggi Luas Volume

    M M M M2 M385 3.350 0.950 0.450 3.183 1.432 86 3.350 5.700 0.500 19.095 9.548 87 3.350 3.300 0.500 11.055 5.528 88 3.350 5.700 0.450 19.095 8.593 89 3.350 2.150 0.400 7.203 2.881 90 1.000 0.970 0.550 0.970 0.534 91 1.000 5.700 0.450 5.700 2.565 92 2.160 3.300 0.400 7.128 2.851 93 0.980 5.700 0.460 5.586 2.570 94 0.970 2.150 0.450 2.086 0.938 95 6.980 6.950 0.4