  • appendix d

    greenHoUse gas eMissions data WorksHeets

  • Harbor-UCLA MedicalCenterDraftEIRAppendixD,GreenhouseGasEmissionsDataWorksheetsD.1 ConstructionEmissionsCalEEModOutput(Annual)

    Phase1ConstructionEmissions Phase2ConstructionEmissions Phase3ConstructionEmissions Phase4ConstructionEmissions Phase5ConstructionEmissions Phase6ConstructionEmissions LABiomedConstructionEmissions

    D.2 OperationalEmissionsCalEEModOutput(Annual)

    ExistingOperations InterimOperations FullBuildOutOperations

    D.3 MobileSourceEmissionCalculations

  • AppendixD.1ConstructionEmissionsCalEEModOutput(Annual)

    Phase1ConstructionEmissions Phase2ConstructionEmissions Phase3ConstructionEmissions Phase4ConstructionEmissions Phase5ConstructionEmissions Phase6ConstructionEmissions LABiomedConstructionEmissions

  • AppendixD.1ConstructionEmissionsCalEEModOutput(Annual)Phase1ConstructionEmissions

  • Off-road Equipment - Client Provided Information

    Off-road Equipment - Client Provided Information

    Off-road Equipment - Client Provided Information

    Off-road Equipment - Client Provided Information

    Trips and VMT - Client Provided Information

    Demolition -

    1.3 User Entered Comments & Non-Default Data

    Project Characteristics -

    Land Use - Client Provided Information

    Construction Phase - Client Provided Information

    Off-road Equipment -

    Off-road Equipment - Client Provided Information

    CO2 Intensity (lb/MWhr)

    1227.89 CH4 Intensity (lb/MWhr)

    0.029 N2O Intensity (lb/MWhr)

    0.006

    31

    Climate Zone 11 Operational Year 2014

    Utility Company Los Angeles Department of Water & Power

    1.2 Other Project Characteristics

    Urbanization Urban Wind Speed (m/s) 2.2 Precipitation Freq (Days)

    Population

    Unenclosed Parking with Elevator 809.00 Space 7.28 300,700.00 0

    1.1 Land Usage

    Land Uses Size Metric Lot Acreage Floor Surface Area

    CalEEMod Version: CalEEMod.2013.2.2 Page 1 of 1 Date: 11/4/2015 5:05 PM

    Harbor UCLA Master Plan- Phase 1South Coast Air Basin, Annual

    1.0 Project Characteristics

  • tblConstructionPhase NumDays 20.00 57.00

    tblConstructionPhase NumDays 230.00 250.00

    tblConstEquipMitigation Tier No Change Tier 4 Final

    tblConstEquipMitigation Tier No Change Tier 4 Final

    tblConstEquipMitigation Tier No Change Tier 4 Final

    tblConstEquipMitigation Tier No Change Tier 4 Final

    tblConstEquipMitigation Tier No Change Tier 4 Final

    tblConstEquipMitigation Tier No Change Tier 4 Final

    tblConstEquipMitigation Tier No Change Tier 4 Final

    tblConstEquipMitigation Tier No Change Tier 4 Final

    tblConstEquipMitigation Tier No Change Tier 4 Final

    tblConstEquipMitigation Tier No Change Tier 4 Final

    tblConstEquipMitigation Tier No Change Tier 4 Final

    tblConstEquipMitigation Tier No Change Tier 4 Final

    tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 7.00

    tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00

    tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00

    tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00

    tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00

    tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00

    tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00

    tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00

    tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00

    tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00

    tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00

    tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00

    Grading -

    Architectural Coating - Paved Coating Exterior- 6% of the square footage

    Construction Off-road Equipment Mitigation - Tier 4 Final, Watering 3x per day

    Table Name Column Name Default Value New Value

  • tblTripsAndVMT WorkerTripNumber 20.00 128.00

    tblTripsAndVMT WorkerTripNumber 13.00 499.00

    tblTripsAndVMT VendorTripNumber 0.00 2.00

    tblTripsAndVMT VendorTripNumber 0.00 2.00

    tblTripsAndVMT HaulingTripNumber 358.00 3,369.00

    tblTripsAndVMT HaulingTripNumber 8,240.00 10,986.00

    tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00

    tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 0.00

    tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00

    tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00

    tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00

    tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 0.00

    tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 0.00

    tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00

    tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00

    tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 1.00

    tblGrading MaterialImported 0.00 37,067.00

    tblLandUse LandUseSquareFeet 323,600.00 300,700.00

    tblConstructionPhase PhaseStartDate 1/20/2021 11/1/2020

    tblGrading MaterialExported 0.00 28,851.00

    tblConstructionPhase PhaseStartDate 8/30/2018 2/5/2020

    tblConstructionPhase PhaseStartDate 5/31/2018 6/1/2018

    tblConstructionPhase PhaseEndDate 4/8/2021 1/19/2021

    tblConstructionPhase PhaseStartDate 1/20/2021 11/1/2020

    tblConstructionPhase PhaseEndDate 8/14/2019 1/19/2021

    tblConstructionPhase PhaseEndDate 8/28/2018 8/29/2018

    tblConstructionPhase NumDays 20.00 57.00

    tblConstructionPhase PhaseEndDate 4/8/2021 1/19/2021

    tblConstructionPhase NumDays 20.00 122.00

    tblConstructionPhase NumDays 20.00 64.00

  • 0.0000 1,842.0255

    1,842.0255 0.1605 0.0000 1,845.3967

    1.2843 0.0610 1.3453 0.3609 0.0576 0.4186Total 4.0088 3.0064 9.2276 0.0239

    0.0000 55.3022 55.3022 5.6100e-003

    0.0000 55.42000.0465 1.4600e-003

    0.0479 0.0124 1.4100e-003

    0.01382021 0.8115 0.0519 0.3056 7.8000e-004

    0.0000 785.7820 785.7820 0.0613 0.0000 787.06990.7327 0.0239 0.7565 0.1953 0.0230 0.21832020 2.9611 0.8680 4.1664 0.0112

    0.0000 952.2064 952.2064 0.0865 0.0000 954.02240.4709 0.0344 0.5053 0.1447 0.0320 0.17672018 0.2262 2.0140 4.4853 0.0113

    0.0000 48.7350 48.7350 7.1100e-003

    0.0000 48.88440.0343 1.3100e-003

    0.0356 8.5400e-003

    1.2400e-003

    9.7900e-003

    2017 0.0100 0.0725 0.2704 5.6000e-004

    Total CO2 CH4 N2O CO2e

    Year tons/yr MT/yr

    PM10 Total

    Fugitive PM2.5

    Exhaust PM2.5

    PM2.5 Total

    Bio- CO2 NBio- CO2

    Mitigated ConstructionROG NOx CO SO2 Fugitive

    PM10Exhaust PM10

    0.0000 1,842.0261

    1,842.0261 0.1605 0.0000 1,845.3972

    1.4382 0.2832 1.7213 0.4306 0.2643 0.6949Total 4.3680 6.9490 9.5107 0.0239

    0.0000 55.3022 55.3022 5.6100e-003

    0.0000 55.42000.0465 7.2800e-003

    0.0537 0.0124 6.7900e-003

    0.01922021 0.8206 0.1495 0.2977 7.8000e-004

    0.0000 785.7822 785.7822 0.0613 0.0000 787.07000.7327 0.0731 0.8057 0.1953 0.0683 0.26362020 3.0390 1.7708 4.1059 0.0112

    0.0000 952.2067 952.2067 0.0865 0.0000 954.02270.6221 0.1858 0.8078 0.2140 0.1732 0.38722018 0.4730 4.6850 4.8064 0.0113

    0.0000 48.7350 48.7350 7.1100e-003

    0.0000 48.88440.0370 0.0171 0.0540 8.9500e-003

    0.0160 0.02502017 0.0356 0.3438 0.3007 5.6000e-004

    CH4 N2O CO2e

    Year tons/yr MT/yr

    Fugitive PM2.5

    Exhaust PM2.5

    PM2.5 Total

    Bio- CO2 NBio- CO2

    Total CO2

    Unmitigated Construction

    ROG NOx CO SO2 Fugitive PM10

    Exhaust PM10

    PM10 Total

    tblTripsAndVMT WorkerTripNumber 25.00 68.00

    2.0 Emissions Summary

    2.1 Overall Construction

    tblTripsAndVMT WorkerTripNumber 126.00 516.00

    tblTripsAndVMT WorkerTripNumber 13.00 40.00

  • Grading Tractors/Loaders/Backhoes 3 8.00 97 0.37

    Grading Rubber Tired Dozers 1 8.00 255 0.40

    Grading Graders 1 8.00 174 0.41

    Grading Excavators 0 8.00 162 0.38

    Demolition Tractors/Loaders/Backhoes 3 8.00 97 0.37

    Demolition Rubber Tired Loaders 1 8.00 199 0.36

    Demolition Rubber Tired Dozers 1 8.00 255 0.40

    Demolition Excavators 1 8.00 162 0.38

    Load Factor

    Demolition Concrete/Industrial Saws 2 8.00 81 0.73

    OffRoad Equipment

    Phase Name Offroad Equipment Type Amount Usage Hours Horse Power

    57

    Acres of Grading (Site Preparation Phase): 0

    Acres of Grading (Grading Phase): 32

    Acres of Paving: 0

    Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 451,050; Non-Residential Outdoor: 150,350 (Architectural Coating

    5 Architectural Coating Architectural Coating 11/1/2020 1/19/2021 5

    250

    4 Paving Paving 11/1/2020 1/19/2021 5 57

    3 Building Construction Building Construction 2/5/2020 1/19/2021 5

    122

    2 Grading Grading 6/1/2018 8/29/2018 5 64

    End Date Num Days Week

    Num Days Phase Description

    1 Demolition Demolition 12/12/2017 5/30/2018 5

    3.0 Construction Detail

    Construction Phase

    Phase Number

    Phase Name Phase Type Start Date

    0.00 0.00 0.00 0.00 0.00 0.0010.70 78.46 21.84 16.18 78.19 39.77

    NBio-CO2 Total CO2 CH4 N20 CO2e

    Percent Reduction

    8.22 56.74 2.98 0.00

    Exhaust PM10

    PM10 Total

    Fugitive PM2.5

    Exhaust PM2.5

    PM2.5 Total

    Bio- CO2ROG NOx CO SO2 Fugitive PM10

  • Use Cleaner Engines for Construction Equipment

    Water Exposed Area

    Clean Paved Roads

    6.90 20.00 LD_Mix HDT_Mix HHDT

    3.1 Mitigation Measures Construction

    Architectural Coating 1 68.00 0.00 0.00 14.70

    14.70 6.90 20.00 LD_Mix HDT_Mix HHDT

    6.90 20.00 LD_Mix HDT_Mix HHDT

    Paving 5 40.00 0.00 0.00

    Building Construction 3 516.00 49.00 0.00 14.70

    14.70 6.90