Henrys Resume 2016 Q3

  • Published on
    14-Feb-2017

  • View
    142

  • Download
    1

Embed Size (px)

Transcript

HENRY CIEPLUCHA

RESUME

HENRY CIEPLUCHA

Contact details

Email henrycieplucha@hotmail.com

Mobile 0400 332 524Home02 4257 0881

SUMMARY OF PERSONAL SKILLS AND ATTRIBUTES

Highly qualified Construction Manager / SMP Superintendent with experience in the Mining, Oil and Gas, Wastewater, Solar and Heavy Industry Vast construction experience on green field and brown field sites Coordinating and supervising turnarounds/shutdowns Able to work independently, and enjoy working as part of the team. Demonstrated excellent leadership skills including supervising and motivating teams First-class analytical and problem solving skills Dedicated to setting and maintaining high standards for quality Committed to high safety standardsSUMMARY OF PLANT AND EQUIPMENT AND INDUSTRY EXPERTISE

Conveyor Systems, Crushing ball and sag circuits, gantry systems, twin vibrating screens and screen houses Sewage / Desalination plants. Wastewater, Reverse Osmosis, Desalination Plants RCU residue cracking and CDU crude distillation units Black oil slurry systems and leaching processes, lime slurry and water filtration systems L'Air Liquide 240TPD oxygen plant Electric and hydrogen furnaces, calciner kilns, Dust suppression systems Ammonia plants, coolant towers Sinter machine emission Acid handling systems including hydrofluoric, nitric and sulphuric acid and pickling systems Gear box maintenance supervisor Falk Renew. Maintenance supervisor BHP stainless.

EMPLOYMENT HISTORY

October 2013 Jan 2015EPC First Solar Australia. Construction Superintendent.102MW power station - Nyngan52MW power station - Broken HillProject Capital Expenditure > 250million

Accountable for the Projects Health, Safety and Environmental policys Adhere to Company Safety Standards and promote safety culture among the ranks through out the Company Conduct short, regular meetings to discuss and record milestones, accomplishments, successes and challenges as they occur Give employees feedback during one-on-one meetings and informally as regularly as possible. Commend your employee in front of their peers Responsible for Civil and Structural supervisor direct reports Conduct daily safety tool box meetings and safety briefs with site contractors Responsible for Civil infrastructure and access roads. Responsible for site Project work installing posting, brackets (PV) Photovoltaic screens.

Further leadership roles include, but not limited to the following: Responsible for Civil and Structural & Mechanical project leaders Responsible for Contracting and Sub Contracting workforce Extensive knowledge of Civil / Structural Codes, Standards and Practices Advanced knowledge in Mechanical and Pipework Codes, Standards and Practices

Jun 2012 - March 2013 EPCM (MEIC) AMEC Mining & Metals Construction Manager.NCA1 CIL Refurbishment Project Newcrest Gold Mine - Lihir Island PMG NCA1 CIL Tank Refurbishment projectProject Capital Expenditure > 100 million

Accountable for the Projects Health, Safety and Environmental policys Adhere to Company Safety Standards and promote safety culture among the ranks through out the Company Manage and oversee the day-to-day construction management of the project Prepares, supervises and approves the construction schedule and its implementation Ensure Lessons Learned are properly documented through out the life of the project including Project Close-out Manage the construction effort and be the construction representative of our company with Client. Oversee the plan, develop and organise the construction effort to formulate the most cost-effective plan Timely completion within budget and to implement the execution of that plan

Construction activities during the project include, but limited to the following:

Supervise Dismantling 5 tanks pipe work superstructure and electrical. Fabricated 3 new tanks, refurbished 2 tanks & commissioned 5 tanks Oversee the installation and commissioning of Superstructures, electrical and IT systems Responsible for 2 Structural 2 Civil and 2 Mechanical Superintendents / supervisor direct reports Key accountability for Papua Natives during project Accountable for the dismantling of 5 tanks pipe work superstructure and electrical instrumentation. Oversee the fabrication of 3 new tanks refurbishments, 2 tanks commissioned & 5 tanks new pipe / spool fit out and installation Responsible for all project Superstructures, electrical and IT installations.

June 2011 - May 2012SMP Construction Superintendent / Acting Construction Manager.Programmed Construction & Maintenance Sino Iron Karratha.Programmed Construction & Maintenance Karara KML Geraldton. Project Capital Expenditure > 50million

Accountable for the Projects Health, Safety and Environmental policys Adhere to Company Safety Standards and promote safety culture among the ranks through out the Company Monitor and report to Project Manager / Sr Construction Manager of project details, including progress, risks and opportunities in a timely manner.Ensure all changes to specifications, work scope and drawings are documentedClearly outline roles & responsibilities to deliver requirements in terms of both scope and schedule to all the team members.Review man-hours and duration forecasts to completion for onshore construction and man-hours, duration and manning forecasts Monitor construction productivity and schedule performance and investigate reasons for less than satisfactory performance Provide recommendations and institute measures for improvement by modification to operating procedures/work instructions. Responsible for 3 Structural & 2 Mechanical Superintendents Manager of 250 Contracting and Sub Contracting workforce Extensive knowledge of Civil / Structural Codes, Standards and Practices Advanced knowledge in Mechanical / Pipework Codes, Standards and Practices

The following activities were carried out on the project, but not limited to the following:Installation of the following equipment and systems Conveyor systems including, gravity take up towers, transfer chutes, pulleys and conveyor tracking systemsPolysius ball mills HP800 Secondary crushersSchenck Twin Deck Vibrating Screens Gyratory NT- 60 x 80 crusherGyratory KB- 63 x 89 crusherConcentrate ThickenersConveyor Shuttle and Tripper systems

Jan 2011 - June 2011

SMP Construction Supervisor / Acting Construction ManagerProteus Engineers EPCM Engineers - FMG CloudbreakProject Capital Expenditure >10million

Accountable for the Projects Health, Safety and Environmental policys Adhere to Company Safety Standards and promote safety culture among the ranks through out the Company Manage and oversee the day-to-day construction management of the project Responsible for implementation of the scope of work as related to construction/ fabrication, pre-commissioning activities Ensures all changes to specifications, work scope and drawings are documented Installation of Conveyor systems including, gravity take up towers, transfer chutes, pulleys and conveyor tracking systemsRemoval of redundant HPGR roll press RPRS 15.0 140/160, hydraulic lubrication cooling and structural equipmentInstallation of new High Pressure Grinding Rolls HPGR RP-S 13-170/140B roll press including QA/QC inspection and sign-off on ITPs upon completion Pre-commission and commission of new High Pressure Grinding Rolls HPGR unit and associated plant/equipment including hydraulic lubrication gear box oil and chilled-water-cooling system

Jul 2010 - Oct 2010

SMP Construction SuperintendentSino Iron Project Cape PrestonProject Capital Expenditure > 5million Accountable for the Projects Health, Safety and Environmental policys Adhere to Company Safety Standards and promote safety culture among the ranks through out the Company Installation of pre-fabricated (China/India) modular desalination unit Mobilisation of personal and equipment to site, preparation of work packs NOTE: Letter of interest (LOI) not signed on due date, safety issues claims not met by client, project stopped, equipment and crew demobilized from site

May 2010 Mechanical Shutdown Supervisor - Rigging/CranageUGL - RPG5 Port HedlandDemonstrated excellent leadership skills including supervising and motivating teams Give employees feedback during one-on-one meetings and informally as regularly as possible.Commend your employee in front of their peersOversee the Installation of conveyor systems, gantries, shuttle and structural steel/modulesCoordination of cranesRegularly check in with employees on their progress on goals; offer coaching or assistance, or revise goals as necessaryLead shutdown Pre-start and safety restart meetingsLiaise with Senior management and Planning and Engineering teams for shutdown schedule progress updates

Feb 2010 - Apr 2010

EPCM/SMP and QA/QC SupervisorBovis Lend Lease, Mulwala Re-development Project - Munitions Plant Propellant manufacture, chemical storage tanks, mixes, transfer conveyors and associated pipe work, propellant finishing, extrusion press product-cutters, hydraulic systems, including process ITPs, NCRs, Hydro-testing inspection and commissioning assistance

Dec 2009 - Jan 2010EPCM/SM and QA/QC Construction / Refurbishment SuperintendentToka Tindung Nusaja Gold Project, North Sulawesi, Indonesia Assess status of established plant for refunding to complete project Inspect percentage of plant completed, ITPs and QA/QC documents, structural material on and off site, and verified consumable required Refurbish sag and ball mills and associated equipment.

Aug 2008 - May 2009

SM Construction SuperintendentMonadelphous - Boddington Copper/Gold Mine, Heap Leach Project, Dry Processing Plant - Fines Circuit

Management and coordination of 14 supervisors and 230 personnel Oversee structural installation of primary and secondary Norberg crushers, conveyors, crushing circuits, gantry systems, Schenck screen house, twin deck vibrating screens, conveyor shuttles, and apron feeders. Generate daily work schedules Allocate resources Conduct supervisor meetings Sign-off on critical equipment Implement OHS policies and procedures and ensured time lines were kept

Feb 2008 - Jun 2008

SMP Construction SuperintendentAker Kvaerner / Solutions EPCM - BP Refinery, Bulwer Island

Coordinate project activities relating to the turn-around of the RCU (residue cracking unit) and the CDU1 (crude distillation unit) including re-work Install new pipe work, valves (RCU flue gas system), pumps, vessels, relieve valves, new flare header, associated platforms, black oil slurry system replacement (process piping and pump replacements in the RCU) Install new pump seal flush panels and pipe work in the RCU Coordinate cranes, scaffolding and other resources Generate and submit construction reports to BP, review work packs, sign-off and witness hydro-tests for process piping and vessels, sign-off mechanical completion of project related scope, sign and review construction contractor time sheets and equipment usage, conduct meetings, monitor JHAs

Jul 2007 - Nov 2007

EPCM SMP Construction SuperintendentAusenco - Dolores Gold + Silver Heap Leach Project - Mexico

Technical and QA/QC support for structural/mechanical works, field engineering, and the Merril Crowe leaching process Resolve contractual problems Oversee pipe work installation from diesel storage tanks to plant generator day tanks, fabrication and mechanical installation of mobile and fixed plant equipment including ore stackers, fine circuit conveyors, product reclaimers and trippers/shuttles Install Nordberg C160 primary jaw crushers and Nordberg HP1000 secondary bowl mantle/cone crushers Supervise construction screen house, dust suppression systems (bag house), Schenck twin deck vibrating screens, overhead shuttle and shuttle drive

Jan 2007 - Jul 2007

EPCM SMP SupervisorAker Kvaerner / Solution - Lihir Gold Flotation Project, PNG

Accelerate the project to return it to schedule Front line supervision to major SMP contractor on the oxygen plant and other sections as per client request Mechanical checks, blow through and pre-commissioning of the L'Air Liquide 240 TPD oxygen plant Correct fabrication and installation errors including turbine pipe stresses Supervise contractor quality and safety performance Monitor equipment and materials requirements Expedite critical parts and materials Pre-commission and hand-over to commissioning completed flotation cells, ball and sag mill, thickener pre-oxidation tank and all associated pipe work.

Aug 2005 - Dec 2006EPCM SMP Superintendent Multiplex Hatch JV - Yabulu Nickel Refinery Expansion Project Capital Expenditure > 650m Plan work for contractors involved in erection of new electric furnace and 110x5.5m diameter calciner kiln, construction of final nickel building, sinter and reduction furnace Construct dust suppression system, saw dust facility and installation of new fuel oil delivery pipelines to calciner furnace, new pumps and pipe work to existing steam plants powerhouse Coordinate and supervise civil contractor night shifts Supervise shut down and tie in of new fuel oil and steam line pipe work and connecting the bypass sawdust facility to calciner operating plant Coordinate construction activity of calciner project to completion and final punch listing Coordinate construction and commissioning of a WWTP (sewage plant) Supervise and assist with utilities packages, ammonia plant, coolant towers, steam and powerhouse, and piping

Jun 2005 - Aug 2005

Site ManagerVeolia Water Systems - Pt Kembla and Bellambi Sewage Treatment Plant Upgrade

Apr 2004 - May 2005

EPCM SMP SuperintendentVeolia Water Systems - Desalination Plant Upgrade

Administer sub-contracts Identify safety and environmental training needs of site crew Inspect and verify sub-contractor works Investigate causes of accidents and dangerous events Coordinate hydro testing of pipe work Final site inspections Conduct safety and tool box talks, promote quality, environmental and safety awareness

Aug 2003 - Apr 2004

Site Construction and Mechanical SupervisorWGE Constructions - BlueScope BOS Water Filtration and Lime Slurry Pipe Line to Metserv Briquetting Plant

< 2003Site SupervisorTolco Engineering and ConstructionSMERP Sinter Machine Emission Reduction Project for SHI Japans Company

SMP Site Construction SupervisorManildra Group - Ethanol Plant

Maintenance Shift SupervisorPort Kembla Copper

Shut Down SupervisorTransfield Services - Caltex Refinery Kurnell and Shell Clyde Refinery Parramatta

Engineering Consultant - Site mechanical installation and commissioningJindal Strips Ltd, India

Specialist Gear Box Fitter Hands-onSupervisorFalk Renew/Gear box refurbishment/assembling testing.

Maintenance SupervisorBHP Stainless Steel, Port Kembla

REFEREES

EPC First Solar Australia.Michael Law Construction Man...