K0 meeting

  • Published on
    13-Jan-2016

  • View
    31

  • Download
    0

Embed Size (px)

DESCRIPTION

K0 meeting. 2007/11/22 Taito Kawasaki. 100 Pa. 1. Pabs correction. Pabs. DDM. DATE. needle valve. Pcor. Vacuum. Ne. needle valve open. preparing. work. press. stable. time. read pressure. all data. Pcor = 0.9881 P 0.7980. collected data. - PowerPoint PPT Presentation

Transcript

  • K0 meeting

    2007/11/22Taito Kawasaki

  • 1. Pabs correctionNeneedle valveVacuumPabsDDMDATEPcor

  • workpreparingneedle valve opentimepressstableread pressure

  • all datacollected dataPcor = 0.9881 P 0.7980

  • Nov 2006 liquefaction ( with corrected P )shift along Temperaturevapor pressure curve

  • Curve TempCCan fit ?fit by ex + x ???

  • fitting resultNov06 Warming

  • Not yet

  • 2. Parameter checkRunnumohdeOHHL5Jan 2007