Products Guide

  • Published on
    26-Dec-2015

  • View
    154

  • Download
    0

Embed Size (px)

DESCRIPTION

Complete structural unit weights

Transcript

  • Products Guide

  • .

    From raw metal to cars, From Korea to the world, Hyundai Steel,

    an innovative steel industry leader, is heralding a new era of

    change and creativity by developing an eco-friendly production

    system based on the "3Rs", reuse, recycle, and reduce.

    ContentS

    CoRPoRate IdentIty (CI)

    H High Spirit( ), Harmony(), Humanity() .

    H , (Bridge)

    .

    .

    High Spirit, Harmony, Humanity

    .

    The symbol H, which embosses the mission of Hyundai Steel, stands for High Spirit, Harmony, and Humanity. The firm and stable axes on both sides of the H imply the past and new businesses and customers. The bridge connecting the two axes suggests a promising future of Hyundai Steel, growing with balanced contact and integration of both axes.

    The bright blue color shows the leading position of Hyundai Steel in future environmental concerns, proposing a new blueprint based on modern technology and reliability. In other words, High Spirit, Harmony, Humanity collectively represent that Hyundai Steel will grow into a world-leading steel company with high spirit and harmony, thereby contributing to the humanity.

    / Introduction

    / Company History

    / Manufacturing

    / Process

    Part 1

    / Hot Rolled Coil

    / Steel Plate

    Part 2

    H / H Section

    H / Steel H pile

    H / Asymmetric H-Beam

    H / Checkered H-Beam

    H / Junior Beam

    I / I-Beam

    I / I-Beam forMine Support

    / Equal Angle

    / Unequal Angle

    / Inverted Angle

    / Channel

    / Parallel FlangeChannel

    / Sheet Pile

    / Railway Rail

    / Reinforcing Bar

    / Thread Bar

    / Round Bar

    /

    Cold Rolled Stainless Steel Sheet, Coil & Strip

    / Ingot for Forging

    / Roll

    / Heavy Machinery

    / Casting

    03

    04

    06

    08

    12

    74

    140

    190

    194

    194

    196

    198

    200

    202

    210

    210

    212

    216

    218

    220

    226

    242

    288

    306

    322

    328

    336

    343

    348

    364

    372

    374

  • 4HyundaI SteelPRoduCtS GuIde

    5

    StaRt~1979 1980~1990 1991~20001953. 06

    1962. 11 ()

    1964. 09

    1970. 04

    1972. 05

    1973. 07 40

    1973. 11

    1975. 05

    1978. 06

    1979. 03 60

    1953. 06 Established as Korea Heavy Industry Corporation

    1962. 11 Changed name to Incheon Heavy Industry Company Ltd. (Privatized)

    1964. 09 Established Incheon Iron & Steel Company

    1970. 04 Merged with Incheon Heavy Industry Company Ltd.

    1972. 05 Commissioned a wire manufacturing

    1973. 07 Commissioned a 40 ton crude steel facility

    1973. 11 Commissioned a wire rod rolling mill

    1975. 05 Commissioned a mini mill

    1978. 06 Incorporated into Hyundai Group

    1979. 03 Commissioned an electric arc furnace mill

    1982. 03 Commissioned a H Section mill

    1983. 02 Commissioned a casting mill

    1985. 02 Expanded 40 ton electric furnace mill to 50 ton mill

    1986. 01 Converted 60 ton electric furnace mill

    1986. 02 Converted wire manufacturing mill

    1987. 02 Expanded 30 ton electric furnace mill to 40 ton mill

    1987. 05 IPO (Initial Public Offering)

    1990. 03 Commissioned a stainless cold rolled steel mill (50,000 tons/year)

    1990. 09 Expanded stainless cold rolled steel mill (120,000 tons/year)

    1992. 01 Completed the 1.1 million ton H Section mill

    1992. 10 Became a full member of the International Iron & Steel Institute

    1993. 12 Renovated the shapes mill

    1994. 12 Completed the 90 ton electric arc furnace mill and second No.2 reinforcing bar mill

    1997. 10 Completed the R&D building

    1998. 03 Completed the 120 ton electric arc furnace mill and new shapes mill

    2000. 03 Merged with Kangwon Industries Ltd.

    2000. 12 Acquired Sammi SteelCompany Ltd.

    1982. 03

    1983. 02

    1985. 02 40 (50 )

    1986. 01 60

    1986. 02

    1987. 02 30 (40 )

    1987. 05

    1990. 03 ( 5)

    1990. 09 ( 12)

    1992. 01 H 110

    1992. 10

    1993. 12

    1994. 12 90 2

    1997. 10

    1998. 03 120

    2000. 03 ()

    2000. 12 ()

    2001~2005 2006~2008 2009~20112001. 04

    2001. 07 INI

    2004. 10 ()

    2004. 10 ()

    2005. 05 A

    2001. 04 Reincorporated into Hyundai Motor Group

    2001. 07 Changed name to INI Steel Company

    2004. 10 Acquired Dangjin Steelworks(Hanbo Iron & Steel) assets

    2004. 10 Dangjin Works was merged and acquired

    2005. 05 Completed commercial test run of Dangjin hot rolled steel mill production

    2006. 03 Changed name to HYUNDAI STEEL

    2006. 09 A harbor opening ceremony for ships with a draft of 50,000 tons

    2006. 10 Completion Hyundai hot-rolled steel mill

    Ground-breaking ceremony for integrated steel mill

    2006. 10

    2007. 07 Ground-breaking ceremony for the closed-loop type raw material treatment facility for the integrated steel mill

    2007. 08 Developed high strength H beam steel for seismic design

    2008. 06 Joined UN Global Compact

    2008. 10 Developed railways for magnetic levitation train

    2008. 12 Obtained Information Security Management System Requirements (ISO 27001) Certification

    2009. 03 Completed 100,000 tons & 200,000 tons berths ofintegrated steel mill

    2009. 03 Developed high strength Reinforcing bar

    2009. 06 Developed large sized Ingot(150 ton)

    2009. 08 Received integrated steel mills first shipment of iron ore

    2009. 11 Began operations of coke plant

    2009. 12 Began operations of sintering plant and plate plant in integrated steel mill

    2010. 01 Fired up No.1 blast furnace began operations

    2010. 01 Began operations of steel making plant and continuous casting plant in integrated steel mill

    2010. 04 Opening ceremony for Dangjin Integrated Steelworks

    2010. 11 Firing ceremony for No. 2 Blast Furnace at Dangjin Integrated Steelworks

    2011. 04 Ground-breaking ceremony for No. 3 Blast Furnace at Dangjin Integrated Steelworks

    2006. 03 ()

    2006. 09 5

    2006. 10 B

    2006. 10

    2007. 07

    2007. 08 H

    2008. 06 UN

    2008. 10

    2008. 12 (ISO 27001)

    2009. 03 10, 20

    2009. 03

    2009. 06 150

    2009. 08

    2009. 11

    2009. 12 ,

    2010. 01 1

    2010. 01

    2010. 04

    2010. 11 2

    2011. 04 3

    ComPany HIStoRy

  • 6HyundaI SteelPRoduCtS GuIde

    7

    ,

    .

    2007 1

    .

    : H, , , ,

    The companys Incheon Works was the very first steel plant in Korea. Its high-efficiency facilities include the worlds largest electric arc furnace mill and a host of environmentally friendly equipments, including recycling its purified wastewater for further use. The addition of the Incheon North Port Steel Dock, completed in January 2007, has made a significant contribution to the plants overall operating efficiency.

    Products : H Section, reinforcing bar, stainless steel, section steel, steel casting product and ingot)

    Incheon Works

    Pohang Works

    .

    : H, , , , ,

    Boasting a wide range of industry-leading technologies, Hyundai Steels Pohang Works was the proud developer of the rail used for the worlds second maglev train. In addition, we lead the industrys higher-added-value market through the production of rail for high-speed railroads, rolled Steel, and track shoe assemblies.

    Products : H Section, reinforcing bar, railroad rail, round section, roll, track shoe assemblie

    Dangjin Works

    Qingdao Factory

    2010

    .

    2 B, C

    A .

    : , ,

    The Dangjin Integrated Steelworks began operating Koreas first privately-invested domestic blast furnace in 2010. It comprises three separate districts: Hot rolled mill A, which produces reinforcing Bar and hot rolls from steel scrap; hot rolled mill B; and hot rolled mill C, which includes two furnaces and a steel platemill.

    Products : hot rolled coil, steel plate, Reinforcing bar,

    2000

    . 2 3

    1

    .

    : ,

    Established in 2000 to meet Chinas rapidly increasing need for steel products, the Qingdao Factory manufactures complete track shoe assemblies. It also acts as a bridgehead for the companys advance into the world by placing us firmly within the Chinese market.Our Qingdao Factory ranked first in the Chinesemarket for undercarriages.

    Products : Track assemblie for excavators, roller

    manuFaCtuRInG

  • 8HyundaI SteelPRoduCtS GuIde

    9

    Integrated Steel- works process Electric arc furnace process

    F

    F

    G

    G

    I

    I

    O

    P

    Q

    M

    N

    A

    A

    B

    B

    DD

    C

    C

    J

    H

    H

    L R

    Scrap steelsteel acquired from used metal products

    Electric arc furnaceproduces molten metal from scrap steel

    Ladle furnacecontrols temperature and components of molten iron in the electric furnace

    Continuous castingproduces semi-finished products by continuously casting molten metal

    Semi-finished productintermediatestage products easily stored prior to final processing

    Reheatingheats H Section to required tempera-ture using bunkerCoil and natural gas

    Rollingproduces finished products by adding strength to two rolls

    Sectionmakes various-shaped Steel from se