  • s e a n v i r i l iw o r k s

  • C o n t e n t s

    P r o j e c t s :

    s u r r y h i l l s f e s t i v a l / / s u s p e n d e d l i g h t i n g e x h i b i t i o n

    u n e s c o d e s i g n c o m p e t i t i o n / / b a m i y a n c u l t u r a l c e n t r e

    r a n d w i c k 1 b e d u n i t / / r e n o v a t i o n p r o j e c t

  • Tonic water, bottles + elbow grease are the key ingredients to a successful lighting installation. Suspended from 6 metres above the ground, over 400 carbon neutral bottles were filled with tonic water and lit up at nightfall with UV lights. The only brief requirement was to successfully install a suspended lighting. Working with extant structure and obstacles, we decided to introduce an interven-tion which would change the skyline for one day. Taking over the local neighbourhood, Surry Hills Festival uses parks, laneways and other spaces in the suburb for an annual 1 day festiv event. Gin&-Juice was selected for use in the Velvet Cave area housing over 2000 guests over the course of the event.

    G I N &J U I C ES U R R Y H I L L SF E S T I V A L

  • After a long period of turmoil, Afghanistan is beginning its second decade of democratic gover-nance. The emerging government has had to manage ongoing instability while taking steps to rebuild the nations infrastructure, which has been devastated by over 30 years of conflict and neglect. Further exacerbating these rebuilding challenges is the geographic isolation and limited access to resources of some parts of the country. Practicality in construction meathods is crutial under such conditions and a design based on prefabrication is being proposed. The centre aims at promoting heritage safe-guarding and cross-cultural awareness.

    B A M I Y A NCULTURAL CENTRE

    U N E S C OCOMP E T I T I O N

  • Bligh Apartment is an ongoing private project involving the complete renovations of a one bedroom flat in the Sydney area. Being an invest-ment property, a specific brief was tailored to maximise the targeted buyer demography.The flat will see the removal of a partition wall in order to promote open plan living and increased natural light for the otherwise dark space. All joinery is bespoke, ensuite is expanded by moving the laundry and all kitchen appliances are concealed.

    B L I G HAP AR TMENTR A N D W I C KR E N O VAT I O N

  • ELEVATION KITCHEN/LOUNGE JOINERY 1A101 1:20

    AMENDMENT

    ISSUE DESCRIPTION BY DATE

    DRAWING TITLE

    DRAWING STATUS

    SCALE

    DRAWING NO. ISSUE NO.

    BLIGH UNIT4/4C BLIGH PLACE RANDWICK EL DORADO NSW 2032

    PROJECT NAME & ADDRESS

    DATE NORTH

    A NB

    16-11-14

    1:20

    KITCHEN JOINERY ELEVATION

    DR

    OP

    OP

    OP

    DR

    DR

    DR

    DR

    DR

    DR

    GENERALLY, THE BUILDER SHOULD COMPLY WITH LOCAL AUTHORITYREQUIREMENTS AND ADHERE TO THE PROVISION OF THE BUILDING CODEAUSTRALIA, BUILDING SERVICE (N.S.W.) AND OTHER RELEVANT AUSTRALIANSTANDARDS. ALL DIMENSIONS SHOWN ON THE DRAWING ARE TO BE CHECKEDON SITE BEFORE COMMENCING WORK AND QUERIES ARE TO BE DIRECTED TOTHE DESIGN AUTHORITY. FIGURE DIMENSIONS ONLY ARE TO BE USED, WITH NODIRECT SCALING FROM THE DRAWINGS ALLOWED. ALL LEVELS ARE TO BECHECKED AND VERIFIED ON SITE BEFORE COMMENCING WORK. THIS DRAWINGIS COPYRIGHT AND IS THE PROPERTY OF CUBIT DESIGN AND MUST NOT BE

    LEGENDOP - OPEN SHELFDR - DRAWERSL - SLIDER PANELDW - DISH WASHEROV - OVENFB- FUSE BOXRH - RANGEHOODFR - FRIDGE FREEZER

    SL SL

    FB

    A-002A200

    JF

    JF

    JF

    PT1

    PT1

    PT1

    PT1

    PT1

    PT1

    PT1

    EQ8

    TL1TL1

    PT1PT1PT1PT1 PT1

    PT1

    EQ9

    EQ5

    EQ10

    PT1PT1

    EQ6

    PT1PT1

    EQ11

    PT1

    REVIEW DRAWING: ENGINEERED TIMBER

    FLOOR ING THICKNESS

  • AMENDMENT

    ISSUE DESCRIPTION BY DATE

    DRAWING TITLE

    DRAWING STATUS

    SCALE

    DRAWING NO.

    GENERALLY, THE BUILDER SHOULD COMPLY WITH LOCAL AUTHORITYREQUIREMENTS AND ADHERE TO THE PROVISION OF THE BUILDING CODEAUSTRALIA, BUILDING SERVICE (N.S.W.) AND OTHER RELEVANT AUSTRALIANSTANDARDS. ALL DIMENSIONS SHOWN ON THE DRAWING ARE TO BE CHECKEDON SITE BEFORE COMMENCING WORK AND QUERIES ARE TO BE DIRECTED TOTHE DESIGN AUTHORITY. FIGURE DIMENSIONS ONLY ARE TO BE USED, WITH NODIRECT SCALING FROM THE DRAWINGS ALLOWED. ALL LEVELS ARE TO BECHECKED AND VERIFIED ON SITE BEFORE COMMENCING WORK. THIS DRAWINGIS COPYRIGHT AND IS THE PROPERTY OF CUBIT DESIGN AND MUST NOT BEUSED WITHOUT IVDL'S DIRECT PERMISSION.

    ISSUE NO.

    BLIGH UNIT4/4C BLIGH PLACE RANDWICK EL DORADO NSW 2032

    PROJECT NAME & ADDRESS

    DATE NORTH

    A NB

    ENSUITE ELEVATION 2

    TOILET CABINET ELEVATION61:20

    VANITY ELEVATION71:20

    REVISION-DRAFT-1

    16-11-14

    1:20

    DR

    OP

    OP

    OP

    DR

    LEGENDOP - OPEN SHELFDR - DRAWERMI - MIRRORSH - SHOWER

    SH

    A-002A400

    STTMI

    JF

    PT1

    EQ4

    STT

    EQ1

    EQ12

    STT

    STT

    EQ12

    EQ1

    EQ2

    MI

    STT

    JF

    JF

    PT1

    A101 A101

  • w w w . i n t r a v e n o u s - d l . c o m

    s e a n@ i n t r a v e n o u s-dl . c o m+ 6 1 . 4 0 2 . 6 9 4 . 3 3 7